A fulsome view of each component of the CDHRP: service centre, diagnostic & treatment centre, reach out, and inpatient unit tower.
A perfect capture of our most popular rendering, from Bell McKinnon approach.
Check out this room with a view! Located in the new Inpatient Unit Tower.
A look South, with views of Somenos Lake.
A close up view of the Inpatient Unit tower, nearing structural steel completion.
The service centre shines at lower left, with a bright future supporting the entire site.
A sunny view through the valley from the North East corner.
Major progress of the mass timber install at the West entrance.
A look at the future Emergency Department entrance, and rooftop cafe.
Back to the skies for an overall peek of the project and its impressive footprint.
A deep look inside to overhead service install and framing.
Community hall progress, and ongoing mass timber install.
A fulsome capture of the entire project at approach, from Bell McKinnon Road.
The service centre remains connected to the main building, through the east side access shown here.
A sunny September morning shows the exterior progress, and peeks of the final siding.
Back to the skies, with a look at the rear of the building and future East entrance.
A ground level look at the future Emergency Department entrance.
Take your first peek inside! Shown here is a capture of the community hall progress.
Sunrise over the new Cowichan District Hospital. Our drone photographer captured this stunning sunrise photo of the construction site at 5:30 a.m.
A view of the high level crews continuing work on level 7 of the Inpatient Unit tower (left), aside the Diagnostic and Treatment centre (right).
Did you know the flat area shown near the bottom left will be home to a future rooftop patio space, for staff and public to take lunch outdoors?
A special set of photos showing the incredible growth thanks to the commitment of all those building this beautiful new facility. Left to right images show progress from July 2023 to July 2024.
Coming around to the back of the site, we can see the progress of the Inpatient Unit to the left of the crane, the Diagnostic & Treatment Centre to the right, and the Service Centre at the bottom right.
A spectacular aerial view taken from the south west corner of the site. The Diagnostic & Treatment Centre is on the left and the IPU tower is located on the right.
A ground level look at the future Emergency Department entry, bonus points if you can spot the signed beam installed May 23rd!
High level view of the future west entrance.
The Inpatient Unit Tower has now officially exceeded the height of the Diagnostic & Treatment centre.
Visible progress as the reach out takes shape, at lower left.
A project milestone celebrated on site with staff and community partners.
Progress continues with the roof install for the top level of the Diagnostic and Treatment centre.
An updated view towards Swuq'us.
View from the North West corner with Somenos Lake shown in the distance.
Project staff pose with D&T steel beam while celebrating staff and user groups at the current CDH.
The Inpatient Unit continues its growth with level 5 started.
A look at the level one entry, on the East side.
Director of Indigenous engagement, Jennifer Jones, and Cowichan Tribes Chief Cindy Daniels, stand outside the future Emergency Department entrance.
North East Corner, with mechanical and electrical level visible at top.
A high level view of the active build site, from the North West corner.
A look at future reach out and main entry from Bell McKinnon approach.
A ground level look at the future Emergency Department entrance.
Visible progress and an active concrete pour captured at lower left.
A near reverse look from Bell McKinnon to Service Centre and Quonset at back.
Looking from the North East corner, towards Bell McKinnon Road.
Ground level view, of the future Emergency Department approach from Bell McKinnon Road.
Another perspective from high above the build site.
Aerial view from the South West corner.
Visible growth from the same vantage captured on October 25th, 2023.
Shout out to the crew that doesn't quit! Showing up, even on the snowy days.
A beautiful start to the New Year as crews continue to build skyward.
A ground level look at the North side.
Crews continue work on both the service centre and main building as winter approaches.
Taking a look from above of both the Diagnostic and Treatment Centre and the Service Centre at far left.
Another view of the impressive footprint and foundation. See if you are able to spot the two workers on top of level 3.
Swuq'us provides a beautiful background to the sunlit site.
Overall site progress shown with Inpatient Unit and Diagnostic & Treatment Centre nearing finish of slab on grade work.
Activity continues on site with many moving parts and materials.
Take a peek through the clouds and cranes to the active construction site.
An overhead look to the entire site and surrounding forest on a sunny November day.
A misty backdrop to the rising Diagnostic and Treatment centre offers a great scale to the incredible work underway.
This week's photo takes a close look at Brodie, an ironworker on the project.
This week's photo captures site staff Paolo, Jamie, Terre, and Romi, tending to the grounds while fully equipped in personal protective equipment.
At the new CDH, site crews building the future hospital honoured National Day for Truth and Reconciliation.
This week's capture takes a close up look at the Diagnostic and Treatment centre as it continues its climb upwards. September 27, 2023.
Aerial site photo taken September 20, 2023
Crane cam photo taken September 13, 2023.
Crane cam photo taken September 6, 2023.
Crane cam photo taken August 30, 2023.
Crane cam photo taken August 23, 2023.
Crane cam photo taken Aug 16, 2023
Crane cam photo taken Aug 9, 2023
Crane cam photo taken Aug 2, 2023
Crane cam photo taken July 26, 2023
Crane Cam Photo taken July 19, 2023
Crane Cam Photo taken July 12, 2023
Crane Cam Photo taken July 5, 2023
Crane Cam Photo taken June 28, 2023
Crane Cam Photo taken June 21, 2023
Crane Cam Photo taken June 14, 2023
Crane Cam photo taken June 8, 2023
Crane Cam photo taken June 1, 2023
Crane Cam photo taken May 25, 2023
Crane Cam photo taken May 17, 2023